Bauxite Hills Project

Expertise

Structural engineering design, documentation and site supervision

Location

Skardon River, QLD

PROJECT NOTES

The facility consists of a reclaim hopper and apron feeder that can be fed from two sides by Cat 988 loaders, and a 300m overland conveyor and barge loading stacker.

The overland conveyor feeds a radial telescoping stacker that produces a linear stockpile on the transfer barges. The stacker is mounted on a floating pontoon.

The overland conveyor has a fixed transfer point at the mid-section for on stream sampling and a hinged head end section to accommodate the tidal movement.