Bunnings Distribution Centre

Value

$12 million

Expertise

Structural engineering design, documentation and site supervision

Materials

Steel fibre reinforced ground slab, structural steel superstructure

Timeframe

2 months from schematic design to final design and construction commencement

Software

Spacegass, AutoCAD

Location

Clifford Rd, Maddington

PROJECT NOTES

The continuous improvement approach at Peritas has continued to pay dividends to our long standing client for this distribution centre. 30,000m2 of crack free ground slabs with 35x35m armored joints and zero saw cuts was an innovative design devised in conjunction with the steel fibre supplier. Further to that, jointless ground slab construction was utilised on the loading dock hardstand to further minimise maintenance at this facility. 15m cantilever canopies to each side of the warehouse provided challenges for wind dynamics design which was accounted for by our experienced engineers.