Kewdale Office and Workshop Development

Value

$10 million

Expertise

Structural design, documentation and site supervision

Materials

Steel fibre reinforced ground slab, structural steel superstructure, permanent formwork to suspended slabs

Timeframe

3 months from schematic design to final design and construction commencement

Software

Spacegass, RC Building, AutoCAD

Location

Cnr of Belmont Ave and Leach Highway

PROJECT NOTES

Peritas has many long standing repeat clients and the developer for the Cameron development trusted in our industrial experience to deliver this significant project. The workshop component was one of our most challenging to date. Load combinations were significant with 15 cranes ranging from 5t wall travelling jib cranes to a 100t gantry with a 15m hook height. In addition to the 7000m2 workshop, we were tasked with designing a 5000m2 warehouse and a 3000m2 three level office building.