Point Fraser Redevelopment

Value

$18 million

Expertise

Structural engineering design and documentation and site supervision

Materials

Suspended ground floor concrete slab supported on piles with a steel framed super-structure. The first floor slab consists of a composite concrete slab utilizing Condeck flooring system by Stramit

Timeframe

4 months from schematic design to final design and construction commencement

Software

Spacegass, Rapt, AutoCAD

Location

306 Riverside Drive, East Perth

PROJECT NOTES

On the Point is Perth’s newest and most revolutionary waterfront entertainment destination. Peritas have been involved in this project from the beginnings in 2011. We utilised our extensive experience in piling, precast concrete, structural steel and permanent formwork to design a structure which was easily constructed considering its location straddling the Swan River and the deleterious soils of the riverbank.