Port Haven Central Facilities

Expertise

Structural engineering design, documentation and site supervision, and Cyclone Haven Design.

Location

Port Hedland, Pilbara WA

PROJECT NOTES

Peritas work included:

  • Dry Mess (Cyclone Haven – Importance Level 4 Structure to for safe haven of staff during cyclone)
  • Wet Mess
  • Administration Building
  • Laundry Building
  • Miscellaneous Canopies
  • Utilisation of screw piling to minimise insitu concrete.
  • Durable building envelope to protect against flying debris as required by AS1170.2.
  • Design documentation and calculations to BHP standard